Design phases include all the basic cycle of design work that can be successfully implemented by our company and, as a rule, consist of such phases as “Design Development” and “Construction documentation” at two-phase design and “Detailed Design” at one-phase design.
Our company offers the services for the implementation of design ideas and intentions of our customers and development, coordination and approval of DED for all design phases, corresponding to the requirements of building codes, rules and regulations applicable in the Republic of Kazakhstan.
Types of design activities:
URBAN PLANNING:
- general plans for the organisation of the territory of the Republic of Kazakhstan
- interregional plans for territorial development
- comprehensive plans for urban planning of territories
- master plans for settlements
- detailed planning projects
- industrial zone planning projects
- development projects
- master plans for facilities and complexes
- landscaping and greening projects
- other planning projects
DESIGN OF RESIDENTIAL AND CIVIL ENGINEERING STRUCTURES:
- residential buildings
- public buildings (offices, cultural and entertainment facilities, shopping and entertainment complexes)
- preschool facilities
- general education facilities
- healthcare buildings
- sports facilities
- multifunctional buildings and complexes
- religious buildings
- high-rise buildings and structures
DESIGN OF INDUSTRIAL FACILITIES:
- energy industry
- processing industry
- light industry
- food industry
DESIGN OF ENGINEERING NETWORKS, SYSTEMS AND EQUIPMENT:
- power supply, electric lighting and power equipment
- heating, ventilation and air conditioning
- water supply and sewerage
- communication systems
- security and fire alarms and fire warning systems
- integrated automation
- gas supply
- outdoor heating networks
- outdoor dispatching networks
- outdoor power supply networks
- outdoor water supply and sewerage networks
- outdoor communication networks
DEVELOPMENT OF SPECIAL SECTIONS OF THE PROJECT:
- work production projects
- construction organisation projects
- technological charts for individual types of work and technological processes
- environmental impact assessment
- section on occupational health and safety
- section on anti-corrosion protection of systems and structures
- section on lightning protection
- section on fire prevention measures
